Svensk Fordonsladdning provides hardware from some of the world's most experienced DC-charger and energy storage manufacturers.
To industries with heavy vehicles, we ensure charging in transport, industry, public transport, shipping and aviation.
Svensk Fordonsladdning has extensive experience with applications and has successfully assisted companies in obtaining investment grants.
The possibility to store energy during periods of low load and thus low costs and reduce high consumption peaks.
Scalable energy storage solutions provide the opportunity to create the right charging capacity for electric vehicles based on current needs.
Svensk Fordonsladdning provides hardware from some of the world's most experienced DC-charger and energy storage manufacturers.
Trafikverkets investeringsstöd till publika laddstationer gäller snabbladdning till elfordon längs större väg.
In June 2020, the government adopted a decree regulating that Trafikverket is tasked with deciding on the payment of state aid for the deployment of public fast charging stations where they are not otherwise built.
Trafikverket har tidigare fått 150 miljoner kronor för att stötta uppbyggnaden av laddinfrastruktur. Från 2023 fick Trafikverket möjlighet att genomföra en fortsatt satsning då över 100 miljoner tillfördes för att stötta utbyggnaden.
Stödet kunde sökas av näringsidkare, kommuner, kommunala bolag etc. för utbyggnad av publika laddstationer för snabbladdning av elfordon i anslutning till större vägar.
The starting point for the selection of routes is the functionally prioritized road network for long-distance passenger travel defined by Trafikverket.
On this basis, an overview has been made of where there is no access to fast charging infrastructure. It is these 'white routes' that will be covered. For a route to be white, it must lack DC charging of 150 kW or more and there must be more than 10 miles between existing fast charging stations.
On European roads and major national roads (TEN-T core and comprehensive road network), the route should lack DC charging of 150 kW or more and there should be more than six miles between existing fast charging stations.
In the review, fast charging stations that have previously been granted state aid are assumed to be built and seen as an existing charging station. The state grants support to fast charging stations via Naturvårdsverket, Energimyndigheten and Trafikverket.
Before choosing the number of routes to be advertised, Trafikverket has made a prioritization based on traffic flow, where the white road sections with the lowest traffic flow have been prioritized. If funds remain after the spring call, we will conduct a supplementary call in the fall.
In the maps, the black lines show which roads are covered by fast charging and the white lines mark roads without fast charging.
Vi stöttar er genom hela processen – från strategi till godkänt stöd och hela vägen till driftsättning.